Warning | Weather Information

Please be aware that all snow detours are in effect due to the current weather conditions. We recommend checking if your route is affected while planning your trip. We are working hard to get you to your destination safely, so please be patient and give yourself extra travel time.

View snow detours Learn more about traveling in winter

Southland Station Bus Terminal Construction, Aug-Sept 2024

Southland Station

The bus loop at Southland Station will be closed between August 12-September 15 for concrete replacement and paving.

The bus stops located within the bus loop will need to be temporarily relocated to allow for this work to be completed.

The affected routes are:

  • Route 81 – Macleod Trail
  • Route 95 – Palliser
  • Route 99 – Acadia/Oakridge
  • Route 106 – Southland/Deerfoot Meadows
  • Route 125 – Cedarbrae
  • Route 126 – Braeside  

Buses on these routes will detour through the parking lot, and pick up and drop off at the designated stop along the sidewalks parallel to the station platform and bus loop (see map). Look for the signage to see where each route will stop. 

PARKING: this means the parking stalls along the sidewalks next to the station and bus loop will be closed to allow for bus access.

The main/north entrance to the CTrain station will still be accessible during construction, via two marked pathways open through the construction area to the entrance from Southland Dr SW.

PLEASE NOTE: CTrain service won’t be impacted by this construction work. 

Categories: